'Control Your Energy Destiny or Someone Else Will.'

Commercial EV Charging Station Installation

3 Electric Vehicle Charging Station Options to Choose From – Each Designed With “FlexSource” Technology
  • Home
  • Commercial EV Charging Station Installation

Request a Free Quote

Name*
This field is for validation purposes and should be left unchanged.

EV Charging Units With “FlexSource” Technology

                                                       Modern Thermal Design manufactures, installs, and maintains Level 1, 2 & 3 EV Charging Stations.

“FlexSource” technology allows the MTD Level 3 DC fast chargers to be configured to use various energy sources, i.e., hydrogen (H2), green grid energy, hydrogenated vegetable oil (HVO), and/or solar, as well as non-renewable sources. We recognize that the use of varied renewable energy sources balances the need for raw materials, spreads patronage among different suppliers and vendors, and adapts to regional resource availability.

Level 3: 180 KW ultra-fast chargers designed for users “on the go.”. The average charge time for the 100-mile range is approximately 15 minutes.

Level 2: 22 KW chargers are ideal for the workplace, apartments and condos, public access, and residential use. The average charge time for the 100-mile range is approximately 2.5 hours.

Level 1–7 KW chargers are ideal for commercial builders & developers. The average charge time for the 100-mile range is approximately 10 hours.

MTD provides a patented 100% Off-Grid Flex Power Package for EV and Hydrogen Filling Pumps

Level 3 180 kW Fast 10 Year Warranty

The Level 3 EV Charging Station is designed for users that are ‘On the Go’

The average charge time for a 100-mile range is approximately 15 minutes

Nano Self-Cleaning Technology

Anti-Glare

55-inch Advertising Screen, double-sided for advertising from local and national merchants.

Dual Port

Amenities: Pet Park, Solar Bench Charging, Solar Lighting, Vending Services

Level 2 22 kW 5 Year Warranty

The Level 2 EV Charging Station is ideal for the workplace, apartments/condos, public access & residential use

The average charge time for a 100-mile range is approximately 2.5 hours

Nano Self-Cleaning Technology

Anti-Glare

55-inch Advertising Screen, double-sided for advertising from local and national merchants.

Dual Port

Level 1 7 kW 2 Year Warranty

The Level 1 EV Charging Station is perfect for Commercial Builders & Developers

The average charge time for 100-mile range is approximately 10 hours

User-friendly LCD (optional)